| Project Overview |
|
Overview of the ProjectsProjects available for immediate investment are solar photovoltaic parks in Western Europe which has the largest volume of completed projects for sale. In some cases this is due to financial pressures on sellers.
The projects are all solar photovoltaic parks comprising crystalline modules, ground mounted with fixed or tracking installations. The projects were constructed by large and experienced Engineering, Procurement and Construction (EPC) companies. The EPC Contract provides for the design, supply and installation of:
A general contractor’s guarantee is provided by the EPC contractor covering standard items along with a standard market Operating and Maintenance Contract (O&M) guarantee for panels and other equipment. Standard maintenance and annual repair costs to secure full performance levels have been included in the forecasts. Security systems with online problem detection and warning are state-of-the-art, repairs will be performed quickly and most spare parts will be held in stock. Major repairs and loss of performance are backed by the following:
Land Lease DetailsThe projects have been constructed on properties that will be leased on long-term leases with terms of 25 to 50 years. The legal due diligence includes a comprehensive review of easements, rights of way, and land titles.
InsuranceThe project insurances included in the offer will cover theft, vandalism and certain elements of force majeure. A separate consultant will be appointed to complete insurance due diligence.
Legal Operating Structure and General Model StructureSingle operating units of 100KW to 10MW power output each are incorporated in some initial investment assets.
Annual Radiation AssessmentThe project revenues depend upon weather conditions and irradiation hours. The financial forecasts are derived from forecast irradiation figures based on weather data and forecasts issued by independent public institutions. Weather fluctuations with cloudy seasons are included in calculations subject to annual degradation for the first ten years and a lower annual degradation for a further 15 years. The annual radiation figures regarding the location of the plants have been taken from sunshine statistics issued by public institutions in Europe and other independent assessments. An major international independent technical consultant will be appointed to review all technical issues. Detailed rradiation maps of each country are used in the project assessment. The following is an irradiation map of Spain providing detailed irradiation data. Such maps are available for all European countries and others where we operate.
AuthorisationsAll necessary administrative project authorisations have been obtained. The authorisation procedure varies according to the local legislative requirements in each country and the maturity of these authorisations is generally 30 years with subsequent extensions available. The point of delivery of power from the solar parks into the power grid is agreed with the local electricity utility and will require a transformer and in some cases a new sub-station. Registration and inscription in the required legal register is completed in accordance with the particular country and municipal legal requirements and includes:
A major international legal firm is appointed to review all legal issues including authorisation.
Operations and Maintenance (O & M)There are separate O&M Contracts for external specialist firms to perform the technical management of each project. These firms will provide ongoing technical management and maintenance to the projects and will be managed by Solar Energy Partners.
|



The projects are either completed and operating or fully permitted, approved and ready for construction. They are located in favourable irradiation zones in France, Germany, Italy and Spain with high sunlight hours and in regions with low ambient temperatures which increase panel performance. Solar parks in Eastern Europe, Canada and the US are also avaialble.